Hi, Is it possible to change the order of back button and side menu button?
I want to show the sidemenu button on left and the back button on right.
Thanks

`
</ion-side-menu-content>
<ion-side-menu side="left">
<header class="bar bar-header bar-stable">
<h1 class="title">test</h1>
</header>
<ion-content>
<ion-list>
<ion-item nav-clear menu-close href="#/app/item">
<span translate>item</span>
</ion-item>
</ion-list>
</ion-content>
</ion-side-menu>
`